Access the Full Project by Clicking here!
Bidjugde
JOB
Pond 9 and 10 Repairs
BID DATE
08/19/15 - 10:00
AGENCY
Windsor
ESTIMATE
n/a
SCOPE
The work involves earthwork required to repair a portion of the west dike of Pond 9 including the removal and replacement of the rock slope protection, stripping the organic material from the pond bottom and dike slopes, keyway, mixing bentonite, moisture conditioning and replacing fill on the interior of the dike, and surface roadway restoration. Another item of work includes the 54-foot extension of the Pond 10 6-inch subdrain pipe and an associated gravel trench drain.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT