Access the Full Project by Clicking here!
Bidjugde
JOB
Garden Acres Bridge Replacement
BID DATE
09/23/25 - 1:00
AGENCY
Boulder County
ESTIMATE
n/a
SCOPE
This project is a planned replacement of the Garden Acres Park pedestrian bridge, which spans the Oligarchy Ditch. A bridge that was salvaged from the Resilient St. Vrain Project will be utilized to be its replacement. The replacement bridge has a longer span than the existing bridge; therefore, rework of the trails, landscaping, and irrigation on either side of the bridge in the immediate vicinity of the bridge will also be required. The replacement bridge consists of two sections; the decking needs to be replaced. Access to the adjacent ditch diversion and pump station will need to remain open during the project. Additionally, the project should not impact the ditch channel and the capacity of the detention area to the north of the bridge. https://www.bidnetdirect.com/colorado/solicitations/open-bids/Garden-Acres-Bridge-Replacement/0000396495?purchasingGroupId=8409951&origin=2 tyler.mellecker@longmontcolorado.gov
UPDATES