Access the Full Project by Clicking here!
Bidjugde
JOB
City New Cordell Water System Improvements
BID DATE
09/3/25 - 8:00
AGENCY
Newcordell Municipal Authority
ESTIMATE
$126,000
SCOPE
1 -1 L.S. Mobilization, bonding, and insurance for water valve installation project 2 -8 E.A. Install 8" resilient seat gate valve and box (wet connection), complete 3 -15 E.A. Install 6" resilient seat gate valve and box (wet connection), complete 4 -15 E.A. Install 4" resilient seat gate valve and box (wet connection), complete 5 -1 L.S. Traffic control in accordance with MUTCD and local requirements 6 -114 S.Y. Pavement removal and replacement with 8" H.E.S. reinforced concrete Alt 1- 1 E.A. Install 8" Insta-Valve 250 insertion valve and box, complete Alt 2 -1 E.A. Install 6" Insta-Valve 250 insertion valve and box, complete Alt 3 -1 E.A. Install 4" Insta-Valve 250 insertion valve and box, complete https://www.civcastusa.com/project/689e092991c0c8bbba99cd81/summary info@cveok.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT