Mexican Dam Portage
BID DATE
09/16/25 - 9:00
AGENCY
Carson
ESTIMATE
$165,561
SCOPE
construction of a pedestrian boat ramp along the Carson River upstream of the Mexican Dam for egress of small non-motorized watercraft (kayaks, small rafts, canoes and paddleboards) to enable safe portage around the dam. The project includes bank excavation and backfill with articulated concrete block, aggregate, rip-rap and boulders; construction of a rockery retaining wall on each side of the ramp; construction/installation of post and pole fence; revegetation of disturbed areas. Carson City will obtain a Grading permit, a Working in Waterways permit, and will produce and obtain the SWPPP with Contractor named on all permits. cakers@carson.org