Access the Full Project by Clicking here!
Bidjugde
JOB
Citrus Grove Road Phase 2 Construction
BID DATE
10/9/25 - 12:00
AGENCY
Lake County
ESTIMATE
n/a
SCOPE
The project consists of constructing four 12-foot travel lanes, 4-foot bike lanes, 22-foot raised median, a 5-foot sidewalk on the south side and a 12-foot multi-use trail on the north side. Roadway work will include milling and resurfacing existing roadway, construction of a new roadway (to include stabilization, base, asphalt), raised medians, curb and gutter, concrete sidewalk/trail, and driveway reconstruction. Guardrail is proposed for the curved section of roadway west of Scrub Jay Lane on the south side of Citrus Grove Road. Thermoplastic striping along with roadway signage will be placed. Drainage improvements include a closed drainage system requiring installation of storm pipe, curb inlets, ditch bottom inlets, mitered end sections and end walls. A dry pond is proposed at east of Scrub Jay Lane and south of Citrus Grove Road. A second pond is proposed west of Scrub Jay Lane and south of Citrus Grove Road. https://c.lakecountyfl.gov/offices/procurement_services/bid_details.aspx?bid_number=25-749&mylakefl=True gretchen.bechtel@lakecountyfl.gov purchasing@lakecountyfl.gov "
UPDATES