Tryon Creek Outfall Erosion Repair
BID DATE
08/19/25 - 11:00
AGENCY
Lake Oswego
ESTIMATE
$250,000
SCOPE
The Tryon Creek Outfall Erosion Repair project consists of re-building a steep eroded slope near 1st Street & E Avenue in Lake Oswego. In a safe working environment, remove loose material and backfill the eroded area with processed granular material. The project includes geogrid, geocell and erosion control blanket installations. Remove existing overhanging section of 18-inch culvert outfall pipe and abandon the buried pipe while rerouting existing two storm laterals from the Oswegan Apartments through existing 18-inch culvert pipe to manhole in street. https://www.ci.oswego.or.us/bids/rfp/tryon-creek-outfall-erosion-repair