Access the Full Project by Clicking here!
Bidjugde
JOB
2025 Annual Sidewalk Replacement
BID DATE
09/2/25 - 7:00
AGENCY
San Carlos
ESTIMATE
n/a
SCOPE
The scope of work generally includes the following but is not limited to, furnishing all labor, materials, equipment, and services necessary or required to perform and construct, complete in place and in satisfactory condition, remove and replace sidewalk, remove and replace driveway, root pruning, curb & gutter and all related items as shown on the specifications and specified herein and as directed by Project Manager in the field. Removal and replacement of concrete sidewalk, driveways, curb and gutter shall be in accordance with Appendix A. https://www.cityofsancarlos.org/bid_detail_T4_R272.php

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT