Access the Full Project by Clicking here!
Bidjugde
JOB
Crosswater Blvd Culvert Rehab
BID DATE
09/11/25 - 7:00
AGENCY
Jacksonville - FL
ESTIMATE
n/a
SCOPE
The project involves structural rehabilitation of an existing culvert beneath Crosswater Boulevard. Key components of the work include: • Installation of Post-Tensioning Anchors: Strengthening the existing culvert using post-tensioned bar anchors to restore structural integrity and reduce joint movement. • Crack Monitoring and Documentation: Implementing a crack monitoring program to record structural movement throughout construction and during the one-year warranty period. • Concrete Repairs and Surface Sealing: Repairing visible cracks and spalls, and applying protective coatings to extend the culvert's service life. • Traffic Control: Providing Maintenance of Traffic (MOT) to safely manage vehicle flow during construction operations. • Training and Handoff: Preparing documentation and training City maintenance personnel to continue crack monitoring after the warranty period ends. BKemp@coj.net
PREBID
8/15/2025 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT