McCarty Ranch Herman Canal Improvement
BID DATE
09/30/25 - 11:00
AGENCY
Port St. Lucie
ESTIMATE
n/a
SCOPE
The project covers the re-grading and stabilization of the canal banks at the south end of the Herman Canal, as well modifications to the existing control structure and the addition of a catwalk. Stabilization will be provided using bank and shore rip rap, with a geotextile liner. Further upstream, the bank will be stabilized using performance turf and hydroseeding. In order to attain a minimum 2:1 slope on the canal bank, the existing 72-inch culvert will be extended south 10-feet. The Contractor shall dewater the excavations to provide a dry condition during excavation and account for site drainage management during the dewatering operation. https://procurement.opengov.com/portal/cityofpsl/projects/181636/document?section=1672277 rholder@cityofpsl.com