Palos Verdes Reservoir Cover and Liner Replacement
BID DATE
09/24/15 - 2:00
AGENCY
MWD
ESTIMATE
$42,000,000
SCOPE
The project consists of demolition of gunite lining; re-grading of clay lining; demolition and modification of existing spillway structure, control tower, inlet and outlet structures; installation of composite drainage course, drain rock, AC paving, geomembrane liner, and geomembrane floating cover (approximately 1,300,000 ft2); modification and installation of 480-volt service, sodium hypochlorite feed system, rainwater removal system, and drainage piping; installation of a precast concrete laboratory building; installation of valve and flowmeter; and other appurtenant work Specs Desk/213-217-6515 specsdesk@mwdh2o.com