Access the Full Project by Clicking here!
Bidjugde
JOB
2025 LMIG Street Resurfacing Group 1 2506-1250200
BID DATE
09/22/25 - 11:00
AGENCY
GDOT
ESTIMATE
n/a
SCOPE
The scope of work for this project consists of public right-of-way (ROW) improvements 4.30 centerline miles/ 16.81 lane miles of asphalt resurfacing, milling, point repairs, roadway striping, loop detector repairs, ADA ramp installation for upgrade and compliance, adjustments to utility and other miscellaneous structures in the ROW. Manhole, Water Valve, and Drop Inlet (Catch Basin) adjustments are to be encased in concrete All work shall be done in accordance with GDOT standards and specifications. chinawilliams@atlantaga.gov
UPDATES