Access the Full Project by Clicking here!
Bidjugde
JOB
Hpw Wastewater Collection System Rehabilitation Renewal
BID DATE
09/4/25 - 7:30
AGENCY
Houston
ESTIMATE
$4,000,000
SCOPE
Work of the contract includes 90 point repairs on sanitary sewers ranging in size from 6 to 24-inches in diameter; 900 feet of additional sewer replacement beyond these point repairs; 90 Service Lateral Repair or Replacement up to 8‘ from center line of Main; 2,000 feet of Service Lateral Repair or Replacement beyond 8‘ from center line of Main; Sliplining or Pipe Bursting approximately 8,650 feet of sanitary sewer ranging from 6 to 24-inches in diameter; Static Pipe Bursting approximately 1,850 feet of sanitary sewer ranging from 6 to 18-inches in diameter; Slurry Boring approximately 750 feet of sanitary sewer ranging from 8 to 12-inches in diameter; cleaning and televising of 123,000 feet of sanitary sewer ranging in size from 6 to 24-inches in diameter; reconnecting 130 services; construction of approximately 30 new manholes; 250 vertical feet of manhole rehabilitation; 1000 square yards of removal and replacement of up to 2" hot-mix asphaltic concrete and 1000 square yards of removal and replacement of concrete pavement; and ancillary work to remove and restore surface features disturbed as a result of the work. https://www.civcastusa.com/project/68826c7a630edcd7eead737d/summary Richard.Hatch@Houstontx.gov
UPDATES