Access the Full Project by Clicking here!
Bidjugde
JOB
2400 Block North Fremont St Pavement Rehabilitation
BID DATE
08/12/25 - 11:00
AGENCY
Monterey
ESTIMATE
n/a
SCOPE
In general, the work consists of, but is not limited to, pavement rehabilitation by way of Full Depth Reclamation (FDR) of approximately 1,656 square yards, excess material off haul and placement of HMA, adjustments of utilities boxes, and installation of traffic markings and striping, including all necessary storm water protection and traffic control measures. The FDR work shall include, but not be limited to, Full Depth Reclamation (17-inch depth) of existing roadway, removal of existing pulverized roadway (5-inch depth), installation of new Hot Mix Asphalt (HMA) Type A (6 inch depth). https://procurement.opengov.com/portal/cityofmonterey/projects/183797/document?section=1694648 barry@monterey.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT