Mrud Storm Sewer Phase 2 Rehabilitation
BID DATE
08/12/25 - 7:00
AGENCY
Malcomson Road Utility District
ESTIMATE
n/a
SCOPE
1-Removing and replacing existing 24-inch CMP interceptor structures with 24-inch HDPE interceptor structures. 2-The implementation, maintenance, and removal of a stormwater pollution prevention plan to protect the existing Lakewood Grove and Lakewood Forest Detention ponds. 3-Site restoration of all areas disturbed by construction, including removing and replacing damaged concrete, repair of existing slope paving and pilot channel, crushed granite trail, asphalt trail, turf, plants, shrubs, fences, and trees in kind; regrading of detention pond, sodding and hydro mulching, as required, and site cleanup. https://www.civcastusa.com/project/688292ea8d40c1dff9b582b4/summary JLContreras@lan-inc.com