Access the Full Project by Clicking here!
Bidjugde
JOB
Chiquola Clatworthy Subbasin Sewer Rehab Phase 1 Division A
BID DATE
08/12/25 - 7:00
AGENCY
Honea Path
ESTIMATE
n/a
SCOPE
Pipe bursting 579 Linear Feet (LF) of 8” HDPE and 466 LF of 10” HDPE sewer lines. Cured In Place Pipe of 421 LF 8” Dia. Reconnection of 19 lateral connections, Structural manhole rehabilitation of 4 manholes totaling 27 vertical feet of lining, miscellaneous point repairs and all restoration. The bid is divided into a Base Bid with three (3) add alternates. keith@dunnshirley.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT