Access the Full Project by Clicking here!
Bidjugde
JOB
St Vrain Greenway Phase 13
BID DATE
09/11/25 - 10:00
AGENCY
Longmont
ESTIMATE
n/a
SCOPE
The St. Vrain Greenway is a multimodal trail extending from the City of Longmont’s Golden Ponds Nature Area to Sandstone Ranch Nature Area, linking a variety of parks, schools, other trails, and businesses along its 8?mile length. It is part of the Front Range Trail plan, a regional trail system that will one day run from Wyoming to New Mexico. The primary work to be performed under this contract includes construction of a greenway trail to the existing St. Vrain Greenway, from Sandstone Ranch Nature Area to St. Vrain State Park (approximately 2.2 miles). This work will include the construction of sections of concrete bikeway and crusher-fines trail, a 170-foot three-span prefabricated steel truss pedestrian bridge, cast-in-place concrete box culvert underpass beneath CO 119 including a stormwater lift station, a 240-foot single span prefabricated steel truss pedestrian bridge over St. Vrain Creek, fencing, erosion control, and landscaping. https://www.bidnetdirect.com/colorado/solicitations/open-bids/St-Vrain-Greenway-Phase-13/0000394533?purchasingGroupId=8409951&origin=2 michelle.davis@longmontcolorado.gov
UPDATES