Access the Full Project by Clicking here!
Bidjugde
JOB
Rigsbee Drive Peppertree Place Laurel Lane Trailridge Drive Paving Water Improvements
BID DATE
09/8/25 - 11:00
AGENCY
Plano
ESTIMATE
$9
SCOPE
Includes the removal and replacement of approximately 5,200 linear feet of existing 6” and 8” waterlines along with full street pavement replacement, and installation of barrier free ramps along Rigsbee Drive, Laurel Lane and Trailridge Drive. In addition, the scope includes approximately 2,310 LF of full street pavement replacement and barrier free ramp installation along Peppertree place. The project also includes the addition of two curb inlets on Laurel Lane, west of Rigsbee Drive and approximately 260 LF of multiple box culvert replacement, including streambank stabilization along streams 2D8 and 2D10 adjacent to Rigsbee Drive. https://planotx.ionwave.net/PublicDetail.aspx?bidID=1995&SourceType=1 rescalera@plano.gov
PREBID
8/8/2025 10:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT