projects bidding

Access the Full Project by Clicking here!
Bidjugde
JOB
SR85 Stormwater Control System Phase I
BID DATE
08/9/11 - 2:00 LIVE!
AGENCY
City of Phoenix
ESTIMATE
$7,700,000
SCOPE
Work shall consist of approximately 1.2m C.Y. of excavation and construction of a stormwater system including a channel and detention basin and associated geotextile material, riprap, gabions and drainage structures. This project has a 8% SBE goal. The Engineer's Estimate is $6.9 Million to $7.7 Million.

PRE-BID
1311786000 REC
TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT