Access the Full Project by Clicking here!
Bidjugde
JOB
Reeves Booster Pump Station
BID DATE
09/24/25 - 11:00
AGENCY
San Clemente
ESTIMATE
$3,520,000
SCOPE
Performing site clearing including removal of trees; grading, removal and abandonment of existing piping and valves; constructing new potable water pump station including construction of 16-inch diameter inlet and outlet piping, pump station building, retaining walls, valves, flow meters, flow meter vault, two (2) 24-inch diameter ΒΌ-inch thick 316 stainless steel pump barrels, two (2) 2500 gpm capacity vertical turbine pumps, two 100 HP motors, electrical and controls improvements including coordination with SDG&E for 400 amp 3 phase 4 wire 480 volt power service to the pump station, switchgear, motor control center, variable frequency drives, harmonic filter, SCADA panel, manual transfer switch, portable generator connection, instrumentation, testing, disinfection, startup and commissioning, and site improvements complete and in place per the contract documents. https://vendors.planetbids.com/portal/28939/bo/bo-detail/132213 ilkhanipoura@san-clemente.org
UPDATES