Access the Full Project by Clicking here!
Bidjugde
JOB
Cassiano Park 2022 Bond
BID DATE
09/16/25 - 11:00
AGENCY
San Antonio
ESTIMATE
$2,550,000
SCOPE
This project consists of furnishing all labor, materials, services, equipment and appliances required with, or properly incidental to all construction detailed in the project contract documents which shall include, but are not limited to: demolition, concrete walk, swimming pool, swimming pool equipment, swimming pool amenities, parking, drainage, site furnishings, masonry, signage, concrete flatwork, concrete foundations, site grading, restroom building, pump room building, lighting, landscaping and irrigation. Additionally, the following additive alternates are proposed. Alternates: 1. Cultural Plaza: including, but not limited to, new concrete walkway with stone block seat walls. 2. Low Impact Development (LID) Feature areas with work including, but not limited to, soil preparation, plant material, river rock mulch, hardwood mulch and sod. 3. Site Amenities: including, but not limited to, climbing wall(s), pool slide, lifeguard chairs, pool lane marker, tables, and chairs. 4. Permanent Site Irrigation System, complete and in place. 5. Shade Structures including, but not limited to, new shade structure at the shower tower and the shade structure re-use/ upgrades. 6. Tree plantings with irrigation: work including, but not limited to, soil preparation, tree planting, tree staking and tree ring mulch. https://www.civcastusa.com/project/687a647af616ebe52f8e9876/summary jorge.figueroa@sanantonio.gov
UPDATES