Access the Full Project by Clicking here!
Bidjugde
JOB
West Douglas Utilities Expansion
BID DATE
08/22/25 - 8:00
AGENCY
Douglas
ESTIMATE
$27,200,000
SCOPE
A water main between along the SR-80 route between Cochise College and a point of connection to the City’s water distribution system at the City’s Well 14 including a Pressure Reducing Valve at Kings Highway (SR 80 and N Copper Avenue). A wastewater collection system between Kings Highway and the northwest corner of the intersection of SR 80 and N Copper Avenue. Alternative 1 includes extending the wastewater collection system from Kings Highway to Cochise College along the SR-80 route. Alternative 2 is for the installation Broadband along the SR-80 route from Cochise College to SR-191. In a future project the pipe will be extended across White Water Draw and connect to the City system generally in the area of SR 80 and US 191. rene.rios@douglasaz.gov https://www.douglasaz.gov/Bids.aspx?BidID=88
UPDATES