Access the Full Project by Clicking here!
Bidjugde
JOB
2025 Castle Valley EWP
BID DATE
07/28/25 - 2:00
AGENCY
Castle Valley
ESTIMATE
n/a
SCOPE
The removal of existing culvert, installation of a new steel box culvert with reinforced concrete headwalls and footings, riprap protection upstream and downstream, and associated roadway reconstruction. Construction elements include structural excavation, backfill, site grading, paving, and concrete. The project is designed to enhance stormwater conveyance and mitigate erosion impacts under the USDA NRCS Emergency Watershed Protection (EWP) Program. Bids will be received for single contract. https://www.castlevalleyutah.com/news_detail_T5_R53.php katie.a@jonesanddemille.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT