JOB
P 2 Sewer Upsizing
BID DATE
08/5/25 - 11:00
AGENCY
National City
ESTIMATE
$4,031,000
SCOPE
The general scope of work is to remove and replace the existing 6” sewer main with 8” and 10” SDR35 pipe along 4th St with an additive bid for Harbison Ave. The scope of work includes but is not limited to removal and replacement of existing sewer manholes, removal and installation of sewer manhole drop structure features, removal, disposal and replacement of 6” sewer main and removal and replacement of existing lateral connections from the main to the end of the right-of-way. Portland Cement Concrete (PCC) improvements include, but are not limited to pedestrian curb ramps, cross gutters, curbs and gutters, sidewalks, raised medians, raised median decorative paving and driveways. Asphalt improvements include, but not limited to trench paving repairs, base paving, cap paving, 2” grind and overlay and 4” dig outs. https://vendors.planetbids.com/portal/24103/bo/bo-detail/131454/ alex@ppc-sd.com
UPDATES