Logistics Parkway Pollard Road Roadway Extension Phase I
BID DATE
08/19/25 - 11:00
AGENCY
Winter Haven
ESTIMATE
n/a
SCOPE
The complete roadway project consists of two (2) phases. Phase I is solely the portion being bid by this invitation. Phase II was constructed prior to Phase I with a completion date of June 2024. Phase I will commence at the terminus of the completed Phase II, extending south (existing City owned wastewater plant #3). Phase I is to be constructed on a combination of existing, acquired public right-of-way and City owned land up to existing Logistics Parkway. Phase I will be new roadway construction with stormwater and utility installations. The proposed road is to be two-lane (12’ lane width) based on an approved cross-section and current FDOT Roadway Design Standards. EOR and CEI Services are contracted separately. https://app.negometrix.com/today/10538 bowen@mywinterhaven.com