Access the Full Project by Clicking here!
Bidjugde
JOB
Taxilane R3 A8B Extension
BID DATE
07/29/25 - 1:00
AGENCY
Adams County
ESTIMATE
n/a
SCOPE
Items of work for this project include Contractor Quality Control Program (CQCP) Temporary Air and Water Pollution, Soil Erosion, and Siltation Control, Mobilization, Method of Estimating Percentage of material Within Specification Limits (PWL), Preparation and Removal of Existing Pavement, Excavation, Subgrade and Embankment, Subbase Course, Crushed Aggregate Base Course, Asphalt Mix Pavement, Emulsified Asphalt Prime Coat, Emulsified Asp[halt Tack Coat, Runway and Taxiway Marking, Seeding, Mulching, Pipe for Storm Drains, and Culverts Manholes, Cath Basins, Inlets, and Inspection Holes, Concrete Culvers, headwalls, and Miscellaneous Drainage Structures, Installation of Airport Lighting Systems. https://www.bidnetdirect.com/colorado/solicitations/open-bids/TAXILANE-R3-A8B-EXTENSION/0000392314?purchasingGroupId=8409951&origin=2 jlachermeier@adcogov.org
PREBID
7/15/2025 1:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT