Access the Full Project by Clicking here!
Bidjugde
JOB
GVWS Transmission Pipelines
BID DATE
08/13/25 - 8:00
AGENCY
Las Vegas VWD
ESTIMATE
$93,747,199
SCOPE
The work consists of installing approximately 44,000 linear feet of 36-inch steel pipe (mortar lined, tape wrapped welded steel), access manways, drains, AVARs, and fiber optic conduits and pull boxes, and access road. Additional work at the existing SNWA Lamb 2350 Pumping Station will include gate and wall modifications, isolation valve vault, and a hydropneumatic facility. All facilities constructed with this package will be owned and maintained by SNWA. Purchasing.HelpDesk@lvvwd.com
UPDATES