Access the Full Project by Clicking here!
Bidjugde
JOB
Sleepy Hollow Waterline Replacement Phase II
BID DATE
08/20/15 - 2:00
AGENCY
Chino Hills
ESTIMATE
$600,000
SCOPE
The work comprises, but is not limited to: mobilization, traffic control, installation of 2,110 L.F. of 14-inch DR 11 HDPE pipe and 185 L.F. of 8-inch DR 18 fusible pipe by horizontal directional drilling methods; furnishing and installation of two-way Altitude Valve, 4 fire hydrants, 4 air-valves, 3 x 12-inch gate valves and a blow-off; construction of 4 retaining walls for air-valve and fire hydrants, relocation of 2 x 1½ water service lines.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT