Access the Full Project by Clicking here!
Bidjugde
JOB
Wickson Creek Special Utility District 2023 Transmission Main Volume 3
BID DATE
07/18/25 - 8:00
AGENCY
Wickson Creek Special Utility District
ESTIMATE
$9,600,000
SCOPE
Construction of approximately 5.19 miles of water transmission/distribution pipeline using 34" IPS DR 13.5 HDPE. HDPE Pipe will be supplied by Owner unless noted otherwise in the bid form. The project will start at the Existing Elevated Storage tank on FM 2776(4050 FM 2776, Bryan Texas 77808) and continue southeast for approximately 1.66 miles along FM 2776 until Dilly Shaw Tap Road where alignment turns south. The alignment continues on Dilly Shaw Tap a distance of approximately 2.43 miles, at which point the alignment leaves Dilly Shaw Tap and continues southeasterly across country for approximately 1.10 miles to tie into existing 34" HDPE on the north side of State Highway 21 https://www.civcastusa.com/project/6851bde954bc827a79cedd5a/summary het.baboo@stvinc.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT