Access the Full Project by Clicking here!
Bidjugde
JOB
Laverne Avenue Flood Control Improvements Phase I
BID DATE
07/29/15 - 2:00
AGENCY
Barstow
ESTIMATE
$1,838,817
SCOPE
The project consists of demolition of: existing asphalt, curb & gutter, sewer & storm drain manholes and pipes, concrete drainage structures, RCP pipes, and rip-rap. Construction of: AC pavement, grading, excavation, curb, curb & gutter, commercial drive approaches, ADA ramps, sidewalk, parkway drains, local depressions, curb openings with catch basins, storm drain piping HDPE, storm drain manholes, junction structures, sewer manholes, pipe culvert headwalls, concrete detention basin slabs, concrete spillway, rip-rap, sewer lines, warped wing walls, cutoff walls, hand railing, salvage and reinstall fire hydrant and street light, striping and signage, erosion control and SWPPP installation and maintenance. The project is located on West Main Street and Laverne Avenue, in the City of Barstow, California, 92311.
PREBID
7/15/2015 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT