Linn Basin Sanitary Sewer I I Rehab Project 2
BID DATE
09/18/25 - 11:00
AGENCY
Linn County
ESTIMATE
n/a
SCOPE
The project includes: • Construct approximately 120 Linear Feet (LF) of above-ground 10” High-Density Polyethylene Pipe (HDPE) pipeline within 24” steel sleeve. • Installation of approximately 1,000 LF of 6” – 8” sanitary sewer main. • Installation of approximately 1,200 LF of 10” HDPE, by pipe bursting. • Inspection and rehabilitation of approximately 47 sanitary sewer laterals (from the mainline to within 5’ of the building). Installation of approximately 15 new concrete sewer manholes. • Restoration of all disturbed surfaces to pre-construction conditions, or better, as called for in the Specifications and Plans. • Perform additional and incidental work as called for by the Specifications and Plans. https://www.demandstar.com/app/suppliers/bids/500675/details