Access the Full Project by Clicking here!
Bidjugde
JOB
Belmondo Levee Repair
BID DATE
06/26/25 - 10:30
AGENCY
King County - WA
ESTIMATE
n/a
SCOPE
The Belmondo Levee Repair will repair up to 100-feet of damage on the levee, existing engineered log jam (ELJ) and rock barb located at River Mile 10.4 on the Cedar River. The project will also include habitat enhancement in the floodplain adjacent to the damaged section of levee. The goal of the project is to repair damages to continue providing flood protection to State Route 169, King County’s Cedar River Regional Trail, and Verizon’s buried interstate fiber optic line, while also enhancing aquatic habitat. https://fa-epvh-saasfaprod1.fa.ocs.oraclecloud.com/fscmUI/faces/NegotiationAbstracts?prcBuId=300000001727151&_adf.ctrl-state=11wckkwai3_1&_afrLoop=38625944186715921&_afrWindowMode=0&_afrWindowId=&j3xbor=1751955564.8234d3d3LmJ4d2EuY29t0725078075ec6f7831c9a308e832c34ad1e99e686cb86cc918d&_afrFS=16&_afrMT=screen&_afrMFW=1528&_afrMFH=834&_afrMFDW=1536&_afrMFDH=960&_afrMFC=8&_afrMFCI=0&_afrMFM=0&_afrMFR=120&_afrMFG=0&_afrMFS=0&_afrMFO=0 brian.pinney@kingcounty.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT