14 inch Waterline Pipe Bursting
BID DATE
08/11/15 - 2:00
AGENCY
American Canyon
ESTIMATE
$1,000,000
SCOPE
The project consists of pipe bursting approximately 6,000 feet of existing 14-inch steel pipe and installing 12-inch fusible PVC pipe along the west side of State Route 29 between Green Island Road and Airport Boulevard. Work shall include mobilization, storm water pollution prevention, traffic control, potholing, temporary water service, pipe bursting, installation of fused HDPE pipe, disconnect/connect services and laterals and a 12-inch ductile iron creek crossing. For technical information, e-mail Cheryl A. Braulik, Senior Civil Engineer, at cbraulik@cityofamericancanyon.org.