Access the Full Project by Clicking here!
Bidjugde
JOB
Replacement Bridge No 874178 NE 10 Avenue Over Canal A
BID DATE
08/20/25 - 11:00
AGENCY
Miami-Dade County
ESTIMATE
$2,693,615
SCOPE
Work under this Contract includes furnishing of all supervision, labor, materials, tools, equipment and performing all operations required to construct the Work in accordance with the Contract Documents. Work includes but is not limited to the following: 1. Demolishing & constructing a new bridge along NE 10th Avenue spanning across the Ademar canal between NE 83rd and NE 84th Streets to accommodate pedestrian and vehicular traffic, dredge & provide rubble riprap for the Ademar canal for the limits shown on plans, reconstructing the road approaches on the north and the south side of the bridge and transition and tie the existing roadway typical section as per plans. Removal of the roundabout at NE 83rd and NE 10th Ave., reconstructing the drainage system between NE 83rd & NE 84th Streets. Upgrading, signing and pavement marking & lighting between NE 83rd and NE 84th St. and constructing a new sidewalk connecting pedestrian traffic between NE 83rd and NE 84th Streets. LOCATION OF WORK: A. The location of work to be performed under the terms of this Contract shall be as follow: 1. Along NE 10 Ave. over Canal A B. https://www.miamidade.gov/apps/isd/StratProc/Home/SolicitationDetails?solNumber=20240256%20(MCC%207360) clerk.board@miamidade.gov
UPDATES