Access the Full Project by Clicking here!
Bidjugde
JOB
East Stockton Blvd Sidewalk Extension to Elk
BID DATE
08/25/15 - 2:00
AGENCY
Elk Grove
ESTIMATE
$179,000
SCOPE
The proposed work shall be performed in accordance with the plans, specifications and other contract documents and shall consist of the following: improve pedestrian access and safety along East Stockton Boulevard with construction of frontage and drainage improvements along the eastern side of the roadway from the newly constructed soundwall to Elk Grove Regional Parks northern driveway. Frontage improvements include: tree and stump removal, new sidewalk, curb and gutter, curb ramps, roadway widening/ paving, drain inlets and pipes, striping and markings and traffic signs (Work). Stephany Carlson City of Elk Grove 8401 Laguna Palms Way Elk Grove, CA 95758 Tel:(916) 478-2212 Fax:(916) 691-3173 scarlson@elkgrovecity.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT