Access the Full Project by Clicking here!
Bidjugde
JOB
Center Camino Overlay
BID DATE
07/18/25 - 4:00
AGENCY
Woodland Park
ESTIMATE
n/a
SCOPE
This project consists of furnishing all labor, equipment, and materials required to complete a 2-inch asphalt overlay on Centre Camino, covering approximately 47,472 square feet between the intersections of Vaquero Senda and County Road. The purpose of this overlay is to restore surface integrity, enhance ride quality, and prolong the life of the existing pavement. All work is to by accordance with City of Woodland Park Engineering Spec and the 2025 CDOT Standard and for Road and Bridge Construction. As an add alternate to the base project, the contractor shall furnish all labor, equipment, and materials necessary to perform a 1.5-inch cold mill (asphalt removal) of the existing pavement surface on Centre Camino. The milling area encompasses approximately 47,472 square feet, between the intersections of Vaquero Senda and County Road. The purpose of this milling is to improve surface bonding, ensure proper overlay thickness, and enhance long-term pavement performance. All milling operations shall be conducted in accordance with the City of Woodland Park Engineering Specifications and the 2025 CDOT Standard Specifications for Road and Bridge Construction. https://www.bidnetdirect.com/colorado/solicitations/open-bids/Center-Center-Camino-Overlay/0000390978?purchasingGroupId=8409951&origin=2 skozurek@woodlandpark.org
PREBID
7/9/2025 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT