Access the Full Project by Clicking here!
Bidjugde
JOB
Water Treatment Plant Raw Water Pump Station Improvements
BID DATE
08/20/25 - 11:00
AGENCY
Mabank
ESTIMATE
$14,000,000
SCOPE
At the Water Treatment Plant, rehabilitation of existing filter building #1 components, new reinforced concrete and CMU filter building #2 with materials, piping, equipment and including all appurtenances, chemical pumps, injection points and manholes, yard piping, flow meters and storage tanks including all appurtenances, installation of new pumps at the transfer pump station and high service pump building including all appurtenances, new backwash lagoon, and various site improvements including but not limited to fencing, and concrete sidewalks. Alternate Bid including 250,000 gallon welded steel ground storage tank and foundation, and asphalt pavement access roads. At the Raw Water Pump Station, the demolition of existing pumps and site components, installation of new vertical turbine pumps, vacuum priming system, yard piping, precast concrete electrical building including all appurtenances, new diesel generator with sound attenuation enclosure, and various site improvements including but not limited to barbed wire fencing, double vehicular gate, pedestrian access gate, and access road. https://www.civcastusa.com/project/685430bc87d0914638e540cc/summary terrelladmin@spi-eng.com jwhite@spi-eng.com malonzo@spi-eng.com sbaral@spi-eng.com
PREBID
7/16/2025 7:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT