Access the Full Project by Clicking here!
Bidjugde
JOB
2027 Smp Package Ii Westlyn Aurora Ave Cable Dr
BID DATE
07/24/25 - 11:00
AGENCY
San Antonio Water System
ESTIMATE
$2,100,000
SCOPE
Sealed bids are requested by the San Antonio Water System for replacement and upsizing of approximately to 8-inch approximately 1,605 LF of 6-inch A.C., main (1962) on Westlyn from Culde-sac to Rawhide Ln, replacement and upsizing to 8-inch approximately 1,230 LF of 6-inch C.I, main (1953) on Aurora Ave. from Alicia to NW 38th St., and replacement and upsize to 8-inch approximately 1,585 LF of 6-inch A.C main (1967) on Cable Dr. from Otter Dr. to Tomar Dr. for the 2027 SMP Pkg II (Westlyn, Aurora Ave., Cable Dr.) https://www.civcastusa.com/project/685c494e77b28610a4a87984/summary yvonne.rodriguez@saws.org
PREBID
7/2/2025 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT