Corregidor Drive Street Improvements
BID DATE
08/11/15 - 2:00
AGENCY
Cathedral City
ESTIMATE
n/a
SCOPE
Proposed street rehabilitation and improvements include driveway approaches, curb, gutter and sidewalk, pulverizing existing asphalt pavement and base material to a depth of 8 inches, compacting the pulverized material, shaping to match design street elevations, paving with 3" of AC pavement and striping and signage. All work and resulting facilities will fully conform to the current adopted Coachella Valley State Implementation Plan (CVSIP) for PM-10 and Congestion Mitigation Air Quality (CMAQ), including Best Management Practices during the construction process.