Access the Full Project by Clicking here!
Bidjugde
JOB
CFB Lift Station Force Main Improvements Phase 4 CAG 25 155
BID DATE
07/22/25 - 11:00
AGENCY
Renton
ESTIMATE
$1
SCOPE
The work involved under the terms of this contract document shall be full and complete installation of the facilities, as shown on the plans and as described in the construction specifications, to include but not be limited to: Site improvements including the installation of bollards, buried conduit and drain piping, site grading, slurry seal surface treatment improvements, and surface restoration, Mechanical improvements including the abandonment of existing and installation of new vent piping, Structural improvements including the installation of a cast-in place retaining wall and slab with a contractor designed shoring system, and interior structural modifications to an existing vault, Electrical improvements including the installation of generators, power distribution equipment, conductors, and modifying and replacing existing control panels. https://edocs.rentonwa.gov/Documents/Browse.aspx id=11635032&dbid=0&repo=CityofRenton mbenoit@rentonwa.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT