Access the Full Project by Clicking here!
Bidjugde
JOB
Annual Water Main Replacement
BID DATE
08/5/25 - 11:00
AGENCY
Cary
ESTIMATE
n/a
SCOPE
? 850 LF 4-Inch Ductile Iron Water Line ? 200 LF 6-Inch Ductile Iron Water Line ? 1,400 LF 8-Inch Ductile Iron Water Line ? 2,500 LF 12-Inch Ductile Iron Water Line ? 1,400 LF 8-Inch Ductile Iron Sanitary Sewer Pipe ? 14 EA 4’ DIA Standard Manholes ? 4,140 LF Abandoned Existing Water Line ? 5 EA Fire Hydrant Assemblies ? 3 EA Abandon Fire Hydrant Assemblies ? 9 EA 4” Gate Valves ? 3 EA 6” Gate Valves ? 3 EA 8” Gate Valves ? 12 EA 12” Gate Valves ? 20 EA Abandon Gate Valves ? 70 EA 1” Single Water Service Connections ? 1,240 TON Pavement Repair Patch – Trench Repair S.9.5C ? 1,600 TON Pavement Repair Patch – Trench Repair I19.0C ? 3,540 SY 1.5” Mill and Overlay ? 820 LF Removal and Replacement of Concrete Curb ? 10 EA Concrete Curb Ramps abiermann@cjsconveyance.com.
UPDATES