JOB
Storm System Repair 6th Del Mar
BID DATE
07/22/25 - 1:30
AGENCY
Aurora
ESTIMATE
n/a
SCOPE
Aurora Water underwent a study to identify facilities that were no longer in use and can come off-line within the near future. This phase of the project involves the demolition of the Prologis Lift Station and the abandonment of the associated 8-inch force main up to exist flow meter manhole. The site will be graded and restored to pre-existing conditions. All above ground appurtenances will be removed to 3-feet below grade and all below grade structures will be filled with sand. https://www.bidnetdirect.com/colorado/solicitations/open-bids/STORM-SYSTEM-REPAIR-6TH-DEL-MAR-PROJECT-NO-6068A/0000391447?purchasingGroupId=8409951&origin=2 heellis@auroragov.org