Access the Full Project by Clicking here!
Bidjugde
JOB
Stevens Ranch Water Main Asr Pipeline Cathodic Replacement
BID DATE
01/1/26 - 3:00
AGENCY
San Antonio Water System
ESTIMATE
$17,000,000
SCOPE
This project will be comprised of two parts, with plan sheets being separated into two volumes. The Stevens Ranch Water Main Project will be volume I of II. This project will install approximately 16,600 linear feet of 16 to 24-inch water main from the intersection of Stevens Circle and Stevens Pkwy to Talley Road. The Stevens Ranch Water Main Project is necessary to improve the reliability of SAWS’ system and to provide service to the proposed Stevens Ranch Development. This project consists of replacing the cathodic protection system that protects ASR pipeline Segments 4, 5, and 6 – 47,116 linear feet of 60-inch, 25,163 linear feet of 42-inch, and 4,460 linear feet of 24-inch steel pipelines with an impressed current cathodic protection system. The improvements implemented under this project will protect the pipeline against corrosion and enhance the longevity of this pipeline. https://www.civcastusa.com/project/6827aef45c5ef6b05fe5a5c4/summary stephen.muniz@saws.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT