Access the Full Project by Clicking here!
Bidjugde
JOB
Macadamia Access Roads Repair Phase 1 East
BID DATE
07/23/25 - 11:00
AGENCY
Hillsborough
ESTIMATE
n/a
SCOPE
Key bid items include mobilization, traffic control, water pollution control, clearing and grubbing, temporary construction entrance, structure excavation, structure backfill, hydroseeding, cast-in-drilled-hole piling, steel soldier pile, timber lagging, geocomposite drain, class 2 aggregate base, 4' chain link fence, rock mesh facing, permanent cellular concrete backfill, 18" HDPE downdrain, cable anchorage system, and headwall. These items represent the full range of tasks necessary to repair and stabilize the access road, incorporating environmental protections, structural reinforcements, and drainage solutions. https://www.barkerblueplanroom.com/projects/358/details/macadamia-access-roads-repair-project-phase-1-east ngribben@hillsborough.net
UPDATES