Access the Full Project by Clicking here!
Bidjugde
JOB
Rehabilitation Fair Store Glass Sidewalks 37 Main Street
BID DATE
07/21/25 - 12:00
AGENCY
Bisbee
ESTIMATE
n/a
SCOPE
Sidewalk Stabilization and Restoration: The priority of this scope is to stabilize and restore the historically significant glass-prism sidewalk. The sidewalk and portion of basement under the sidewalk is on city property, as such the engineering fees and restoration work must be coordinated and funded by the city with State Historic Preservation Office oversight. The beams holding up the sidewalk also provide substantial lateral support to the front columns of the building, these beams have started to fail from sprawling concrete due to rusting rebar inside of them. The beams must be repaired or replaced, but concrete sheer walls must be placed under them to divert the lateral forces, prior to any repair / replacement. (See exhibit documents for details) jstuart@bisbeeaz.gov https://bisbeeaz.gov/bids.aspx?bidID=54
PREBID
7/8/2025 8:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT