Access the Full Project by Clicking here!
Bidjugde
JOB
CB25 001 Lift Station 3 6 15 Rehabilitation
BID DATE
07/18/25 - 11:00
AGENCY
Cocoa Beach
ESTIMATE
n/a
SCOPE
The project consists of three (3) lift station rehabilitation projects. The project descriptions are listed below. The projects include, but are not limited to, the following work: Lift Station 3 Rehabilitation: Removal of existing riser piping, underground valve vault and identified electrical equipment. Installation of above ground stainless steel piping assembly, new stainless steel rising piping, approximately 20 linear feet of 6-inch C900 DR-18 PVC force main, temporary bypass pumping, abandonment of existing 6-inch force main pipe, associated electrical upgrades, and site restoration. Lift Station 6 Rehabilitation: Removal of existing riser piping, underground valve vault, and identified electrical equipment. Installation of above-ground stainless steel piping assembly, new stainless steel rising piping, concrete doghouse manhole, approximately 25 linear feet of 6-inch force main pipe, water service connection, associated electrical upgrades, and site restoration. Lift Station 15 rehabilitation: Removal of existing riser piping, top, slab, underground valve vault, and identified electrical equipment. Installation of above-ground stainless steel piping assembly, new stainless steel rising piping, approximately 25 linear feet of 6-inch C900 DR18 PVC force main, temporary bypass pumping, lift station top slab and hatch with fall protection, 5-foot diameter doghouse manhole, removal of existing 6-inch diameter force main pipe, associated electrical upgrades, and site restoration. alyssa.colby@kimley-horn.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT