Access the Full Project by Clicking here!
Bidjugde
JOB
Florida Avenue Havana Street Missing Sidewalk
BID DATE
07/9/25 - 2:00
AGENCY
Aurora
ESTIMATE
n/a
SCOPE
Construction consists of the following improvements: • Construction curb ramp, curb, curb and gutter, concrete median, concrete pavement, Sidewalk, and hot mix asphalt (patching) • Tree removal, gravel removal, curb and asphalt mat removal • Erosion control The proposed improvements for this area include the construction of an 8-foot-wide concrete sidewalk in the space that was previously occupied by gravel. This enhancement aims to improve pedestrian access and safety, providing a durable and long-lasting pathway for public use. Work not specifically called for, but necessary to perform the contract work will be considered incidental to the contract whether specifically detailed or not. https://www.bidnetdirect.com/colorado/solicitations/open-bids/Florida-Avenue-and-Havana-Street-Missing-Sidewalk/0000390585?purchasingGroupId=8409951&origin=2 ayoung@auroragov.org
PREBID
6/24/2025 8:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT