Access the Full Project by Clicking here!
Bidjugde
JOB
TK Jones Parking Lot Improvements Phase II AZ
BID DATE
07/18/25 - 10:00
AGENCY
Department Interior
ESTIMATE
n/a
SCOPE
This project consists of site preparation, asphalt paving, pavement sealing, striping, and curb painting to enhance the designated loop and parking spurs within the recreation site. The primary scope includes: • Subgrade Preparation & Paving: Excavation, grading, and compaction of subgrade, followed by the placement of approximately 1,723 square yards of 4-inch-thick hot mix asphalt (HMA) with a 2%–5% cross slope to ensure proper drainage and alignment. • Fog Seal Application: Sealing of the new asphalt pavement to enhance durability and longevity. • Striping & Roadway Markings: Application of approximately 1,500 linear feet of pavement markings, including parking spaces, camping spots, and roadway elements such as edge lines, centerlines, and stop bars, per industry standards. • Curb Preparation & Painting: Cleaning, prepping, and repainting approximately 2,530 linear feet of existing curbs in designated colors (red: 1,637 LF, blue: 198 LF, yellow: 695 LF), ensuring coverage on both faces of the curbs. The painting portion of the project shall include: o Surface Preparation: Ensure curb surfaces are clean, dry, and free from debris, oil, or loose paint. o Paint Selection: Use traffic-grade paint suitable for outdoor conditions, adhering to local regulations (e.g., red for no parking zones, yellow for loading zones). o Application: Apply paint uniformly, considering weather conditions to ensure proper drying and adhesion. o Safety Measures: Implement appropriate traffic control measures during painting operations to protect workers and the public. • Site Clearing & Cleaning: Removal of brush, weeds, and debris to prevent contamination of pavement and paint materials
UPDATES