Access the Full Project by Clicking here!
Bidjugde
JOB
Inverrary Bridge Forcemain Relocation
BID DATE
07/18/25 - 11:00
AGENCY
Sunrise
ESTIMATE
n/a
SCOPE
The Work for this project consists of, but is not limited to, the construction of approximately 1,200 linear feet (LF) of 12-inch ductile iron and C900 PVC forcemain (FM) from the connection location at the south east corner of the bridge which crosses over the C-13 canal at Inverrary Blvd. W, and routed west approximately 1,000 LF. Then the new FM will transition above ground and be routed north on an aerial canal crossing over concrete piles, then the new FM will transition back underground to the tie in location. This project also includes providing two insertion valves at both tie in locations, providing an air release valve, providing a 12” plug valve with restrained mechanical joint cap for future connections, associated excavation, trenching, backfill, compaction, restoration, asphalt repairs, the demolition and disposal of approximately 1,200 LF of existing 12-inch ductile iron FM and other associated work. All of which shall be constructed in accordance with the Drawings and Specifications, as specified in the Contract Documents. https://www.demandstar.com/app/suppliers/bids/502479/details
PREBID
6/27/2025 7:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT