Access the Full Project by Clicking here!
Bidjugde
JOB
Fox Hollow Flood Repair
BID DATE
07/1/25 - 11:00
AGENCY
American Fork
ESTIMATE
n/a
SCOPE
Snow melt runoff in the early summer of 2023 caused flood damage to two structures in the American Fork River within the Fox Hollow Golf Course in American Fork. The project includes installing a concrete ramp and repairing and installing a corrugated metal pipe culvert in the American Fork River at Fox Hollow Golf Course. Concrete ramp work includes stream alteration, bank stabilization and other bank improvements, including placement of rip-rap and grouted rip-rap. Culvert work includes headwall and energy dissipator repair, culvert installation and retrofit, and placement of rip-rap. Other aspects of the work include landscaping restoration and fence installation. There are two separate bid tables for this project for funding purposes. https://utah.bonfirehub.com/opportunities/190288
PREBID
6/24/2025 12:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT