Access the Full Project by Clicking here!
Bidjugde
JOB
(CMAR) Well Improvements Phase II South Tempe Water Treatment Plant
BID DATE
07/8/25 - 1:00
AGENCY
Tempe
ESTIMATE
$15,000,000
SCOPE
Major components of the Project will include: ? Well 15 drilling, installation, and testing ? Well 15R drilling, installation, and testing ? Vertical turbine well pump with sounding tubes for water level measurement ? Variable frequency drive for Well 15 ? Reverse Voltage Soft Start (RVSS) motor for Well 15R ? Conversion of existing Well 15 to a monitor well ? Piping from the existing distribution line to each well ? Pump to Waste piping from each well ? Down Hole Flow Control Valve ? Water flush lubrication system ? Ancillary equipment related to well controls Instrumentation and connections to Supervisory Control and Data Acquisition (SCADA) system for a fully automated well ? Electrical power for all new equipment ? Piping to existing raw water pipeline to water plant ? A CMU building which will house an electrical room ? Each site will also be graded to accommodate storm water conveyance to existing retention basins at the plant
UPDATES